(length 8 min.)

The Strato Family:
a complete water based range.

Sanding and Vacuuming

Closing the Gaps:
with Strato 101 and sanding dust for optimum color matching.

Drying Time:
approx. 30 to 90 min.

Sanding:
sanding with coarse grit and belt sander and corner sanding machine. Then fine sanding with a 3 disc machine.

Vacuuming:
carefully before primer application.

Roller Primer:
Strato 200

Drying Time:
approx. 1 h

Mixing:
two-component water based finish Strato 461 with Hardener. Then leave it for 15 min.

Finishing

Drying Time:
after first coat approx. 6.

Intermediate Sanding:
with single disc machine and again vacuuming.

Second Finishing:
with two-component water based finish.

Ready!
Drying time: approx. 12 h, final hardness: approx. 7 days. The result is convincing.
Maintenance: see movie "Cleaning and sealing of sealed floors"
Please follow Technical Data Sheet.